Laserfiche WebLink
999 <br /> UNION CARBIDE CORPORATION <br /> METALS DIVISION <br /> P.O. BOX 1029, GRAND JUNCTION,COLORADO 81501 <br /> TELEPHONE (303) 245-3700 <br /> August 24, 1979 <br /> RECEEWED <br /> Mined Land Reclamation <br /> 723 Centennial Building 2 h 19%9 <br /> 1313 Sherman Street <br /> Denver, Colorado 80203 <br /> PaliNtu uaNu iIECLF',Id:rlilON <br /> Attn: Mr. Robert Campbell Colo. Dept. of Natural Resources �q <br /> Dear Bob: � ,� <br /> Enclosed are maps, annual progress report and a check in the amount of $275.00 <br /> for renewal of the King Solomon-Dolores Bench Permit #77-296. <br /> I <br /> Affected acreage to date is 16.3 acres and includes a new portal and nine 4upp <br /> to be constructed on the Cliffdweller claim as shown on the second map (DOLO <br /> GROUP-NORTHWEST) . Additional small areas may be disturbed for ventilation <br /> sites in the upcoming year and throughout the life of the mine within the per- <br /> mitted area. Portions of the non-mineral waste dumps at the existing main <br /> portals may be removed for tailings dam stabilization at the Uravan mill in <br /> 1979 and 1980. This waste rock removal will not change the affected 'acreage, <br /> as it would be removed from waste dumps now in use. <br /> As was stated in the original permit applications, most reclamation eFforts <br /> cannot take place until final cessation of mining operations in the distant <br /> future. However, selected venthole sites will be seeded this fall for reve- <br /> getation in test plots and soil amendment requirements. <br /> If you have further questions, please do not hesitate to call . <br /> Yours very truly, <br /> l 1� <br /> Kent DahV <br /> P1ine Engineering J Uravan <br /> KO/brh <br /> Encl . <br />