My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP27858
DRMS
>
Back File Migration
>
Report
>
REP27858
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:39 PM
Creation date
11/27/2007 4:53:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
Report
Doc Date
11/6/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> ~i_T.~5 .1995 11:3=Hhl LPi: h!If1ERRL5&GEi;LV~1' <br />H0.488 F."c2 <br /> • <br /> ~ <br /> III III III III IIII III ~ <br /> ]-n9 Operations <br />Notice of In'. ~ <br /> 110e Construction Materials Annual Revort ~ <br /> <br />RECEIVED <br />~!J <br />T <br /> Fermitt ee 11Rme: ~ ATOrdyke Conetructior, Inc <br /> Pzrmit 'JO. M-54-114 <br /> operation name: xrordyke Pie No z NOV U6 1998 . <br /> anniversary race: October 05, 1998 .. <br /> i'otal: $225.00 (Due on your Anniversary-Jat~~110ef815&(i~. <br /> 9 <br />9 <br /> 1. ~ <br />a. Permitted acreage: <br /> b. County where mine ie locatefl: Custer <br /> Z. 11R9 this mine been grant®d TEt4POR4RX CESSA.~ON STA^US? ~ YES <br /> Does this mine opera to MCRE Or L959 than 180 days per year? MORE LPSS <br /> 3. noes this :nine have a phased reclamation plan? YES NO <br /> - - ~--- - 1 acre <br /> 4. Total acres affected during the report yeaY:• <br /> none <br /> 5. Motel acres reclaimed for the report Year:• <br /> <. Tota'_ number of sores in topsoil replacement stage: 1 acre <br /> none <br /> a. A~~erage ehieknesa of togeoil replaced: <br /> ~. ?otal number of acres seeded: we have seeded the topsoil stockpile <br /> e. Liac epaciea seeded a seeding rate for report year or. back <br /> NA <br /> 6. For non-phased operat'_ons provide dates extraction ceased: <br /> NA <br /> a. Date reclamation began: <br /> 5. T'.ie type and approximaee quantity of Fertilizers, organic material or soil <br /> conditioners used for the report year:* <br /> 30, ^asti:tatea total acres to be affected in the next re~ort year;* 2 acres <br /> we have seeded the to soil stock le area <br />p p1 <br /> i' . COMdE*1TS: <br />Please show the location of the acreage for items 4 - 6 o:i yoL`r map•*. Indicate <br />eY.e passes of cY.e reclamation Which have been co_mpleeed, correlated with your timetable. <br />For .phased operaticns show dates extraction tea&ed and dates reclamation began. <br />NOT&: 2P ohere have not been anY changes since the last annual report and you <br />previou s_y submitted a map ~thich cOYYBCtIy 3apicts the current acreage in items 2 through <br />6, then a new mag is unnecessary, however, this must be stated above, <br />sig.^.a to re: 6~~4~ Ante: November 3, 1998 <br />Please type or print current ccnta-t r_am=, mailing address, and nhoae number below, <br />ecntact Name: Arthur Nordyke ~ Phone: 1779 ) 783-2761 <br />Company: Nordyke Construction FAX No: (71 9 1 7R"~~~~ _ <br />Address: _ 302 Main Street - _ <br />Westcliffe, Colorado 81252 <br />9ederal Tax SD :to. or Social. Security A'o.; <br />
The URL can be used to link to this page
Your browser does not support the video tag.