My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP26967
DRMS
>
Back File Migration
>
Report
>
REP26967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:58:00 PM
Creation date
11/27/2007 4:37:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
1/16/2002
Doc Name
2nd half 2000 Review Checklist
From
Tom Kaldenbach
To
File
Permit Index Doc Type
Subsidence Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Checklist for Subsidence Monitoring Report <br />Mlne: Foidel Creek Date this review was completed: 1/16/02 K <br />Permit No.: C-82-056 CDMG reviewer: Tom Kaldenbach <br />Report period: 2"d half 2000 <br />Panel(s) mined during report period: 3 Right and 2 Right <br />Monitorin re uirement <br />g 9 Re ulation citation <br />g In compliance: <br />Yes / no ? Comment <br />Installed and surveyed <br />See comment on <br />monuments prior to 2.05.6(6)(c)(i)(A) Yes 2.05.6(6)(c)(i)(D), below. <br />undermining <br />Located monuments to Total surface strain is determined <br />detect vertical by locating monuments at <br />subsidence and 2.05.6(6)(c)(i)(B) Yes expected points of minimum <br />horizontal displacement. strain (over gateroads) and <br /> maximum strain (mid- ane]). <br />Monitored each <br />structure's orientation, 2.05.6(6)(c)(i)(C) Yes <br />location, elevation <br />Monitored each <br />monument and structure 2.05.6(6)(c)(i)(D) Yes <br />at least uarterl <br /> Only the three powerlines (all in <br /> one corridor) and Middle Creek <br /> were undermined during the <br /> reporting period. Station H63 <br />Commenced monitoring (pane] 3R) was surveyed 10/25/99 <br />of each monument and and station H64 (pane12R) was <br />structure at least one 2.05.6(6)(c)(i)(D) Yes surveyed 6/9/00, both more than <br />month prior to six months before the powerlines <br />undermining were undermined by each panel. <br /> Middle Creek overlying panel 2R <br /> was surveyed in 5/99, more than <br /> six months prior to undermining <br /> in 8/00. <br />Surveyed Hayden-Gore <br />Pass powerline on <br />schedule: daily when pp. 2.05-191.1 and yes <br />longwall face was 500 191.2 of permit <br />ft. before and 1500 ft. <br />after owerline. <br />Surveyed Wolcott Tap- <br />Wolcott (PSC) <br />powerline on schedule <br />depending on longwall <br />location: p. 2.05-191.2 of yes <br />a) advancing within permit <br />300 ft of line - <br />survey every two <br />days; <br />b) underneath line <br />
The URL can be used to link to this page
Your browser does not support the video tag.