Laserfiche WebLink
O <br />C ~ ~ ~ <br />e <br />ENGINEERING & SURVEYING, INC. <br />III IIIIIIIIIIIII III <br />999 <br />555 S. CAMINO DEL RIO <br />BODO OFFICE CENTER • UNIT A-I <br />POST OFFICE BOX 97 <br />DURANGO, COLORAD081302 <br />TELEPHONE 970-247 1705 <br />FAX 970-247-1710 <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND, UTILITY AND CONSTRUCTION SURVEYS <br />March 13, 1996 <br />Harry Ranney <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: CARBON JUNCTION MINE; NO. C-92-080 <br />Deaz Harry: <br />~ ] 5 1996 <br />Division o1 Minerals & Geolcgy <br />When we met on February l9, 1996, [had asked you if the last quarter report was <br />sufficient for your review. You told me at that time that you needed to see additional <br />calculations from Lambert & Associates, relative to the slope stability analysis. In that <br />respect, I am forwarding the information which they have subsequently furnished to me. <br />I trust that this will provide the additional information that you need. <br />HLG/ws <br />V ruly yours, <br />arty L. Go , P.E. <br />cc: I) Jim Hendricks <br />2) Lambert & Associates <br />