Laserfiche WebLink
iii iiiiiiiiiiiuiii <br />RECEIVED <br />February 12, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />FFB 17 1996 <br />Division of Minerals 8 Geology <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />[weekly Pond Compliance Report <br />February 8- FF~e~bruary 14, 1998 <br />Dear Mr. Dillie: `.Jl ~, <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of Februar;~ 8- <br />February 14, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.014 ppm CN-wad and 0.043 <br />ppm CN-total. The collection pond averaged 0.023 ppm CN-wad and 0.069 <br />ppm CN-total. <br />S`in~ ly, ( 1 <br />Julio F L Madrid <br />cc: Bill Lyle <br />Dan Robertson <br />