Laserfiche WebLink
iiiiiiiiiiinium <br />E~~A <br />S Coal Company Seneca Coal Company <br />RECEIVE <br />APR 111997 <br />Division of Mmerais ~ neology <br />April 7, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RT: Seneca II Mine - Wadge Highwall Drainage Fill <br />Dear Ms. Crosby: <br />Attached please find a copy of the first quarter inspection <br />report for the above-referenced fill. Reclamation grading had <br />been deferred in the West Wadge Pit due to the conditions of <br />Technical Revision No. 16. The West Wadge Pit has been graded <br />for the most part with some final grade and drainage work, and <br />stockpond construction to be completed this year. Two areas on <br />the highwall side and portions of the drainage bottom require <br />some maintenance repairs. This entire inspection area should be <br />completely reclaimed by the end of the upcoming reclamation <br />season. <br />if you have any questions, please call me. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Attachment <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 278-3707 • FAX (970) 278-3014 <br />