My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21281
DRMS
>
Back File Migration
>
Report
>
REP21281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:54:43 PM
Creation date
11/27/2007 3:06:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
12/29/1997
Doc Name
QUARTERLY INSPECTION REPORT WASTE COAL
From
NORTHWEST COLO CONSULTANTS INC
To
BOWER BROS CONSTRUCTION
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii, <br /> <br />Geotechnital l Enrironmenul Engineering • Materials Testing <br />nr-~'+~ <br />I-t ~ ~/ t_ i,~~ L <br />per, 2 ~ 1~~1 <br />Oivicion of MInQr21E tt (uoplnCly <br />Subject: Quarterly inspection Report, Waste Coal <br />Area, Foidel Creek Mine, Rout County, Colorado. <br />Gentlemen, <br />December 22, 1997 <br />Bower Bros. Construction <br />595 Taylor Street <br />Craig, CO 81625 <br />Attn: Mr. Bud Bower <br />Job No. 95-2296 <br />As requested, Northwest Colorado Consultants, Inc. has prepazed this letter outlining our inspections <br />made during the fourth quarter of 1997 a[ the Waste Coal Area, which is located at the Foidel Creek <br />Mine in Rout[ County, Colorado. <br />We visited the project site on September 30, October 15 and November 6, 1997 to test dte compaction of <br />the waste coal materials being placed in Area Nl. The contractor had placed and compacted the majority <br />of the waste coal materials in the central portion of Area bl. A total of 12 compaction tests were taken <br />during these visits. The approximate location of the tests, as well as Ute compaction tests taken during <br />the third quarter of 1997 aze shown in the attached Figure N1. The results of our compaction tests aze <br />also attached. it should be noted that the abbreviations given in the Nucleaz Density Tes[ Results <br />(Proctor Data) aze as follows: Maximum DD =Maximum Dry Density and OMC =Optimum <br />Moisture Content. Bodt of these values have been determined in accordance with ASTM <br />D698/AASHTO T99. <br />We also visited the site project site on October I, November 25 and December 15, 1997 and observed the <br />contractors operations and construction methods. It should be noted that these observations/inspections <br />were made while we were completing the Supplementary Geotechnical Investigation for the Refuse <br />Disposal Area. <br />Based on our inspections and the compaction test results, it appears that the waste coal materials have <br />been placed and compacted in general accordance with the project plan and specifications. It should be <br />noted that as of the second week of November, [he contractor had stopped placing compacted lifts in the <br />waste coal pile due [o the recent cold weather and snow. The materials coming from the wash plan[ were <br />being stockpiled in the central pottion of Area N1 and along the west side of Area k2. <br />(970) 879.7888 • Fax (970) 879.7891 <br />29585 U.S. 40 West, 8oz 775226 • Steamboat Springs, CO 80477 <br />
The URL can be used to link to this page
Your browser does not support the video tag.