Laserfiche WebLink
Ike ~ ~ S S ~ ~ <br /> <br /> <br /> Notice of Intent to Continue Mining Operati ns RE <br /> <br />112c <br />Construction <br />Material Annual Re or CEIVE D <br /> <br />Permittee Name: Butala Constr uction Company <br />Permit No. M-77-170 SEP 2 1 i998 <br />Operation Name: Butala Gravel Pit <br />Anniversary Date: October O1, 1 998 <br />Total: $550.00 (Due on your Anniversary Da e) DIV OF MINERALS <br /> 8 GEOLOGY <br /> 32 7 <br />1. a . Permitted acreage : <br /> C h a f f e e <br />b . county where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? X1~x NO- <br /> Does this mine operate MORE or LESS than 180 days per year? ~~~ LESS <br />3. Does this Tine have a phased -reclamation plan? YES_ ~R'X <br />4. Total acres affected during the report year:* 0.5 <br />5. Total acres reclaimed for the report year:* x•75 <br />6. Total number of acres in topsoil replacement stage: 0.5 <br /> a. Average thickness of topsoil replaced: 6 ;nCheS <br />7. Total number of acres seeded: 0.5 <br /> a. List species seeded & seeding rate for report year on bat <br />0. For non-phased operations provide dates extraction ceased: <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* None <br />10. Estimated total acres to be affected in the next report year:+ 0.75 <br />11. COhIMENTS: <br />+ Please show the location of the acreage for items 4 - 6 on your map**. Indicate <br />the phases of the reclamation which have been completed, correlated with your timetable. <br />For phased operations show dates extraction ceased and dates reclamation began. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 through <br />5, then a row map is //un~~"ne c/e~s sary. However, this must be stated above. <br />signature ~~~i.,~~`- Date: September 16, 1998 <br />Please type or print current contact name, mailing address, and phone number below: <br />contact Name : F ran k B u t d l d <br />company Butala Construction <br />Address: P 0 _ Rnx 907 <br />sal;rla, r.o 61201 <br />Federal Tax ID No. or Social Security No.: <br />Phone: ( 719 ~ 539-2521 <br /> <br /> <br />