Laserfiche WebLink
,- <br /> <br />III IIIIIIIIIIIII III i <br />STATE OFCOLORADO RICMARDD LAMM Gave mor <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe. Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building, 1313 Sherman Street <br />Denver, Colorado 80203 Te1.1303) 666.3567 <br />David C. Shelton <br />Director <br />April 1, 1983 <br />Mr. Richard E. White <br />1801 West 2nd <br />Rifle, Colorado 81650 <br />L~'C~4.~~~~~' <br />~`,~•~t 3 9 1983 <br />Re: File No. 81-6 <br />°~,~ MINEi) LNNll H~C!_ANIATION <br />(.,~~ ~~ Colo. Dept. of Natural Resources <br />~O <br />Based upon our records, the anniversary date of your mining operation permit is <br />April 27 and annual fees for the year(s) 1983 totalling <br />S 350.00 are due on that date. Fees are based upon a schedule of <br />5350.00 if the operation is an open mining operation of 10 acres or more and <br />5275.00 for any other operation 10 acres or more. <br />Also, to bring the Division up to date as to the mining and reclamation on the <br />• site, please submit a report and map (to a scale of not less than I00' to the <br />inch and not more than 660' to the inch), indicating the phases of the r_°clama- <br />tion plan which have been completed, correlated with the timetable. The report <br />and map shall contain the following information: <br />1) Location and number of acres affected during that year, <br />2) Locations and number of acres reclaimed for that year, <br />3) The location and number of acres in the various stages of reclamation <br />(backfiZled, graded, topsoil replaced, revegetated), <br />9) The species of vegetation planted, the locations and approximate dates <br />of planting, <br />5) The type and approximate quantity of fertilizers, organic material or <br />soil conditioners used and location of use, <br />6) An appraisal of the success of reclamation efforts, and in the event <br />of failure of any efforts, a short narrative on the suspected or determined <br />causes of such failure, <br />7) Estimates of the location and number of acres to be affected in the <br />coming year, and <br />8) The effective date of the information provided above shall be no more <br />than 45 days prior to the anniversary date. <br />1 <br />