Laserfiche WebLink
~I~ ~~~~~~~~~~~~~~~~ <br />999 <br />RECEIVED <br />JAM 2 4 2000 <br />Division of Minerals & Geology <br />January 20, 2000 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Shex~nan Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />January 16, 200j0~ - January 22, <br />Dear Mr. Dillie: ~ y <br />- San Luis Project <br />2000 <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of January 16, <br />2000 - January 22, 2000, as required by the approved TR-010. <br />During the week, the tailings pond averaged <0.010 ppm CN-wad and <0.010 <br />ppm CN-total. The collection pond averaged <0.010 ppm CN-wad and 0.013 <br />ppm CN-total. <br />S~ceUUr. e^l y~ <br />~n~AN <br />Julio F. Madrid <br />~d <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />