Laserfiche WebLink
<br />iii iuiiiiiniiiiii <br />March 21, 1997 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. (BMRI) - San Luis Project <br />DMG Permit No. M-88-112, TR-O10 <br />Weekly Pond Compliance Report <br />March 16 - 22, 1997 <br />Dear Mr. Dillie: 5C1U,~p <br />Attached is a summary of the on-site cyanide analyses performed <br />on samples from the tailings pond and the collection pond during <br />the week of March 16 - 22, 1997 as required by the approved TR- <br />010. <br />During the week, the tailings pond was 0.32 ppm CN-wad and 0.35 <br />ppm CN-total. The collection pond was 0.31 ppm CN-wad and 0.35 <br />ppm CN-total. <br />Sincerely, <br />~~7 <br />Ron Zumwalt <br />cc: Anne Baldridge <br />Dan Robertson <br />