Laserfiche WebLink
RE~E~~EO IIIIIIIIII~ <br />- 555 SOUTH CAMINO DEL RIO <br />APR U 9 1998 BO DO PROFESSIONAL CENTER • UNIT A t <br />POST OFFICE BO% 97 <br />- - - _= _= DU RANGO. COLORADO 81302-0097 <br />Division of Minerals&Geoto TELEPHONE970-247-1705 <br />9Y FAX 970-247-1710 <br />ENGINEERING & SURVEYING, INC. <br />CONSULTING CIVIL AND SANITARY ENGINEERING <br />LAND. UTILITY AND CONSTRUCTION SURVEYS <br />April 6, 1998 <br />Harry Ranney MAR--~e~- <br />Colorado Division of Minerals & Geology ~(yl°`^^ ^_-____..''""•...... '_ p`~~,~y <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />RE: CARBON JUNCTION MINE; NO. C-92-080; FIRST QUARTER REPORT, 1998 <br />Dear Mr. Ranney: <br />During the previous quarter (through March 31, 1998) work has commenced on the <br />Carbon Junction rechannelization within Carbon Junction Canyon as shown on Map 5-10. <br />Specifically, reshaping of the fill pile is underway. <br />Two of the items remain from my last (1-28-98) report which still need attention (see <br />attached). <br />This constitutes my report for the period mentioned. <br />cc: 1) Jim Hendricks <br />2) Mike Savage <br />tn.cl55 <br />