Laserfiche WebLink
.. 999 <br /> <br />RECEIVED <br />P1AY 17 1999 <br />May 14, 1999 <br />vivis;on of Minerals & Geology <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. Colorado 80203 <br />Re: Battle Mountain Resources, lnc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Report <br />May 09, 199/9/(~- May 15, 1999 <br />Dear Mr. Dillie: L./~ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of May 09, <br />1999 - May 15, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.03oppm CN-wad and 0.287 <br />ppm CN-total. The collection pond averaged 0.023 ppm CtQ-wad and 0.028 <br />ppm CN-total. <br />Sincerely, <br />~o~ ~:~~~ <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />