Laserfiche WebLink
E~~A <br />S Coal Company <br />III IIIIIIIIIIIII ill <br />Seneca Coal <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RECEIVED <br />JUL 21 T898 <br />DIV. OF MINERALS <br />& GEOI tlnv <br />July 17, 1998 <br />RE: Seneca II Mine - Wadge Highwall Drainage Fill <br />Dear Mr. Boulay: <br />Attached please find a copy of the second quarter inspection <br />report for the above-referenced fill. Reclamation grading had <br />been deferred in the West Wadge Pit due to the conditions of <br />Technical Revision No. 16. The entire inspection area has now <br />been completely reclaimed with only some final drainage riprap <br />needing to be installed. With the next technical revision to be <br />submitted, Seneca will propose that this quarterly inspection be <br />ceased since only minor maintenance repairs will need to be done <br />from here on out. <br />If you have any questions, please call me. <br />Attachment <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276.9707 • FAX (970) 276.7014 <br />