Laserfiche WebLink
E~~ NECi4 <br />S Cosl Company <br />February 20, 2007 <br /> <br />Mr. Mike Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 ®~~`~'~~~ <br />Denver, CO 50203-2273 f~ <br />FEB 2 3 tU01 <br />RE: Seneca II Mine Permit C-80-005, Annual Hydrology Report pivis~a: o+ Reclamation, <br />Mining and Safety <br />Dear Mr. Boulay, <br />Enclosed please find two copies of the 2006 Annual Hydrology <br />Report for the Seneca II Mine. This report contains a <br />compilation and analysis of all hydrologic data collected during <br />the period extending from October 1, 2005 through September 30, <br />2006. Two copies of this report were also forwarded to the <br />appropriate Federal offices to the attention of the individuals <br />specified below. <br />Please contact me at 970-276-5209 if you or any other members of <br />the Division have any questions or wish to discuss the report. <br />Sincerely, <br />1~ ~~ <br />tr <br />Dennis Jones <br />Hydrologist I <br />Enclosures <br />C: Carl Johnston, OSMRE, Denver <br />John Husband, BLM, Craig <br />Seneca Coal Company <br />I ~ Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />