My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17745
DRMS
>
Back File Migration
>
Report
>
REP17745
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:44 PM
Creation date
11/27/2007 2:13:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977393
IBM Index Class Name
Report
Doc Date
3/29/1990
Doc Name
112 ANNUAL FEE LETTER
From
MLRD
To
VARRA FRONTIER MATERIALS
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• iiirinii~iii~«i~i <br />• MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7373 Sherman St.. Room 275 <br />Denver. CO 80203 <br />303 6663567 <br />FAX 303 8328706 <br />March 29, 1990 ~ ~~ <br />Varra / Frontier Materials ; ~_gS~ <br />2130 S. 96th ~`~ <br />Broomfield, CO 80020 <br />112 Annual Fee Letter <br />STAT~ OF COLORADO <br />~~3~ a <br />~i <br />F ~O <br />4, ~ ~ ~D9 <br />R; 9~ <br />Cr i F 1IY~ <br />~1 ~.~ <br />/g 76 ~ <br />Roy Romer. <br />Governor <br />Fred R. Banta <br />Division D~recror <br />In order to maintain your mining operation in compliance with the law, the annual <br />fees, report, and map required by C.R.S. 34-32-116(3) and (4) muss: be submitted <br />annually on or before your Dermit anniversary date. Fees are based upon a <br />schedule o i your operation is an open mining operation anti 5275 for any <br />other operation. Division records indicate you owe $350.00. <br />Permit No.: <br />Operation Name: <br />• Anniversary Date: <br />Annual Fees for the Year(s) <br />Total: <br />M-77-393 <br />Jenkins Site <br />06/01 /90 <br />1990 <br />5350.00 (Due on your Anniversary Date) <br />IF YOUR ANNUAL FEES, ANNUAL REPORT, AND MAP ARE NOT RECEIVED ON OR BEFORE YOUR <br />ANNIVERSARY DATE, A CIVIL PENALTY IN THE AMOUNT EOUAL TO YOUR-AARUA~FEE-AMOUNT <br />WILL BE AUTOMATICALLY ASSESSED AND WILL BE DUE AND PAYABLE WITHIN THIRTY (30) DAYS <br />FROM YOUR ANNIVERSARY DATE. <br />If your records indicate different facts than those stated above, please inform <br />this office as soon as possible, otherwise, we will expect to receive the annual <br />fee, the enclosed Notice of Intent to Continue Mining Operations (your annual <br />report), and your map, as required by the statute, on or before your anniversary <br />date. If you cannot include these materials with t e eh~e; o e sE indicate on the <br />enclosed annual report form how soon we should expect to receive these materials. <br />as required by the statute on or before your anniversary date. <br />7o bring the Division up-to-date as to the reclamation on the sil:e, please include <br />in your annual report, and map the following information: <br />Your map should be to a scale of not less than 100' to the inch t7nd not more than <br />660' to the inch, it should indicate the phases of the reclamation plan which have <br />been completed and correlated with the timetable as required. Your report and map <br />shall contain the following information: <br />• 7) Location and number of acres affected during that yea^; <br /> 2) locations and number of acres reclaimed for that year; <br />
The URL can be used to link to this page
Your browser does not support the video tag.