My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP17257
DRMS
>
Back File Migration
>
Report
>
REP17257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:46:19 PM
Creation date
11/27/2007 2:05:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977346
IBM Index Class Name
Report
Doc Date
9/25/1998
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII • <br />Notice of Intent to Continue Mining Operations <br />112c Construction Materials Annual Report <br />Pemuttee Name: Holnam, Inc. - Ft Collins Plant <br />Pernut No.: M - 77 - 346 <br />Operation Name: Boettcher Gypsum Quarry <br />Anniversan• Date: November 10, 1998 <br />Total: 5550.00 (Due on your Anniversan~ <br />1. a. Permitted acreage : 105.5 <br />b. County where mine is located: LARIMER <br />ck<. 12080>>~ <br />RECEIVED <br />SEP 2 5 <br />DIV. OF" MINERALS <br />& G=OLOGY <br />2. Has this been granted TEMPORARY CESSSATION STATUS? YES NO <br />Does ibis mine operate MORE or LESS than 180 days per year? MORE LESS <br />3. Does this mine have a phased reclamation plan? <br />4. Total acres affected during the report year: * <br />5. Total acres reclaimed for the report year: * <br />6. Total number of acres in topsoil replacement stage: <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back. <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />YES NO <br />0 <br />N. A. <br />9. The type and approximate quantity of fertilizers, organic material or soil conditioners used for the <br />report year: * N. A. <br />10. Estimated total acres to be affected in the next report year: * 0 <br />11. COMMENTS: No chances since last map was submitted. <br />* Please show the location of the acreage for items 4 - 6 on your map * *. <br />Indicate the phases of the reclamation which have been completed, correlated with your timetable. For <br />phased operations show dates extraction ceased and dates reclamation began. <br />* * NOTE: If there have no[ been am• changes since the last annual report and you prevdoush• submitted <br />a map which correctly depicts the current acreage in item 2 through 6, then a new map is unnecessary. <br />However, this must be staled above. <br />Signatur . rA~~,~ Date: ~-BOf~u~~ lFz ~1~? <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: JOEL BRANNAN Phone: (970) 482-f065 <br />Company: HOLNAM. INC. FAX No: (970) 482-1363 _ <br />P. O. BOX 1548 <br />LA PORTE, CO 80535 <br />Federal Tax ID No. or Social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.