Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br /> <br />ocr ~ c z~~n <br />BATTLE MOUNTAIN RESOURCES, INC. <br />Division of RAinerals and Ceolagy <br />October 04, 2000 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Monthly Pond Compliance Report -September, 2000 <br />Dear Mr. Dillie: <br />Attached is the September 2000, monthly summary of cyanide analysis performed on <br />samples from the tailings pond and the collection pond as required. TR-O10 specifies a <br />simple monthly average for regulating pond compliance. The September averages are as <br />follows: <br />Tailings Pond 0.01 ppm CN-wad, 0.02 ppm CN-total. Collection Pond 0.02 ppm CN-wad, <br />0.05 ppm CN-total. <br />Sincerely, <br />~~ <br />Ron Zu alt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />A SUBSIDIARY OF BATTLE M1fOUNTAlN GOLD COMPAA'Y' <br />P.O. Box 310 San Luis, Colorado 81152-0310 (719) 672-412'_ Fax (719) 672-3363 <br />