Laserfiche WebLink
III IIIIII <br />IIIIIIIII <br />899 I <br />BATTLE MOUNTAIN GOLD COMPANY <br />October 23, 1996 <br />Mr. Sim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE <br />~1 ~~ ~6 <br />Division at mmereis ~ Goo Day <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG ~-err„it Idc. M~-48~-i12, TR-0'0 <br />Weekly Pond Compliance Report <br />October 13 - October 19, 1996 <br />Dear Mr. Dillie: ~ <br />iJ ~` <br />Attached is a summary of the daily on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of October 13 - October 19, 1996, as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.30 ppm CN-wad and 0.37 ppm <br />CN-total. The collection pond averaged 0.19 ppm CN-wad and 0.30 ppm CN- <br />total. <br />Sincerely, <br />C <br />Sally H, Kaiser <br />Environmental Engineer <br />cc: Anne Haldrige <br />Dan Robertson <br />-'~ <br />P.O. BOX 710 SAN LUIS, CO 81152-0310 (719)672-3362 EXT. 39 FAX (719) 672-3363 <br />