My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP15306
DRMS
>
Back File Migration
>
Report
>
REP15306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:53 PM
Creation date
11/27/2007 1:38:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
4/8/2002
Doc Name
March 2002 Monthly Sampling
From
Battle Mountain Resources Inc
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BATTLE MOUNTAIN RESOURCES, INC. <br />April 5, 2002 <br />Mr. Jim Dillie <br />RECEI1,~Ep <br />APR 0 8 ZOL7 ~ <br />Division of Minerals and Geology Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203lj~ C.,tL(°-~ P'~°"~ ~~'`~/ <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-112 ~ <br />March 2002 Monthly Sampling ~_ <br />Dear Mr. Dillie: <br />All required sampling was completed during the month. <br />The water treatment plant discharged a total of 8,197,200 gallons of water (25.16-acre feet) to <br />Rito Seco Creek during the month. <br />All surface water stations were inspected weekly and RS-3, RS-4 and RS-6 was found to be <br />dry. <br />Vacuum on the lysimeters was verified and no water was present to sample. <br />The piezometers on the main embankment of the tailing impoundment were checked on <br />March 31, the piezometers were dry or contained below 12 inches of water. <br />The west pit piezometers were measured for depth to water on March 31, with the following <br />results: <br />BF-1 was 28.67 ft., BF-2 was 32.36 ft., BF-4 was 25.93 ft. and BF-6 was 31.82 ft. Other <br />piezometers in the West Mine area were also checked with the following results: PW-1 was <br />29.27 ft., PW-2 was 29.63 ft., PW-3 was 36.78 ft. and PW-4 was 31.51 ft. <br />The underdrain was measured at approximately 42 gpm. <br />The collection pond leak detection system was pumped on the 31st of this month. This is the <br />first time the system was pumped due to frozen conditions since November 29, 2001 or in 122 <br />days. A total of 2,699 gallons was pumped on the 31st of March giving 22.1 gpad. <br />Seepage along Rito Seco Creek remained dry throughout the month. <br />With DMG approval a total of 816,300 gallons (2.51-acre feet) of water was pumped from <br />Water Treatment Plant to the tailing impoundment during the month. <br />P.O. Box 310 Sao Luis, Colorado 81152-03I0 (719) 379-0798 Pax (719) 379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.