My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP14589
DRMS
>
Back File Migration
>
Report
>
REP14589
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:44:25 PM
Creation date
11/27/2007 1:28:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
4/1/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112D-3 HARD ROCK/METAL AND DMO ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ ~~~ ~~~~~~~I~~~~~~~~ i REGEIVEp <br />Notice of Intent to Continue Mining Operations ~~ <br />112d-3 Hard Rock/Metal and DMO Annual Report O'!~ <br />Permittee Name: Cripple Creek & Victor Gold ~(y~' II~ <br />Permit No. M-BO-244 "~^~~Mrnera)sQ <br />Operation Name: Carlton Project ~e0lpyy <br />Anniversary Date: April 09, 1997 <br />Total: 51,000.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: 2026.6 b. County where mine is located: Teller <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE <br />For 110 2 Operations: Do you extract MORE or LESS than <br />70,000 tons of mineral or overburden a year? MORE LESS <br />3. Does this mine have a phased reclamation plan? NO <br />4. Total acres affected during the report year:* 633 <br />5. Total acres reclaimed for the report year:* O <br />6. Total number of acres at topsoil replacement stage: 36.7 <br />6" <br />a. Average topsoil thickness replaced: <br />7. Total number of acres seeded: 85 <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Dates reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* .633 <br />11. COMMENTS: I"I7.Il1Il° COntllllle5. <br />* Please show the location of the acreage for items 9 - 6 on your map*' <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />~- <br />Signature: ~ ~,vti~..~', ~ -.~ Date: ?'larch 29. 1997 <br />Please type or p4 fnt current contact riafiie, mailing address, and phone number below <br />contact Name: Virginia F. Reilly Phone: (719 ) 689-4(147_ <br />FAx No: c719 ) 639 3254 <br />company: GYinnle Creek & Victor Gold Mi ' Company <br />Address: D•~• BOX 191 <br />Victor DD 30460 <br />Federal Tax ID No. or social Security No.: <br />
The URL can be used to link to this page
Your browser does not support the video tag.