Laserfiche WebLink
999 <br /> <br />September 4,1998 <br />Mr. Sim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />SEP 8 1998 <br />DIV. OF MINERALS <br />8 GEOLOGY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />August 30 -///September 5,1998 <br />Dear Mr. Dillie:~,j{=~ <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and the collection pond during the week of August 30 - <br />September 5,1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.010 ppm CN-wad and 0.100 <br />ppm CN-total. The collection pond averaged 0.012 ppm CN-wad and 0.026 <br />ppm CN-total. <br />Sjn erely, <br />J/ulio F. Madri <br />cc: Bill Lyle <br />Dan Robertson <br />