Laserfiche WebLink
<br />MOUNTAIN GOLD COMPANY <br />March 19, 1996 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />~,,.: <br />,. R~~~I~I~n <br />2 "1 1996 ~~ <br />.u~: ~ BATRE MOUNWN <br />I ~~jfi61 a16 ~~^'""~ GOLD COMPANY <br />Division o <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />March 10 - Marc/hl1~116, 1996 <br />Dear Mr. Dillie: A V <br />Attached is a summary of the daily on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of March 10 - 16, 1996 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.46 ppm CN-wad and 0.67 ppm <br />CN-total. The collection pond averaged 0.26 ppm CN-wad and 0.31 ppm CN- <br />total. <br />Sincerely, <br />Sally Hayes Kaiser <br />Environmental Engineer <br />cc: Anne Baldrige <br />Dan Robertson <br />P.O. BOX 310 SAN LULS, CO BI152-0310 (719)672-3362 EXT. 39 FAX (719) 672-3363 <br />