Laserfiche WebLink
A <br />6.50 <br />6140 <br />8430 <br />r 6420 <br />z <br />4 <br />w 86 0 <br />6400 <br />A' <br />¢> 6 <br />1 N_AUL ROPD <br />6 <br />KEYWAY . \ =143 <br />/ DRAIN BEDROCK <br />390 I INFERRED FROM <br />6 <br />G OP1`OE, _ \\ SOIL BORINGS <br />TABLE <br />(SEE NOTE E1) 11 <br />63B0 <br />�ow d R R S A S & S R R S S <br />a w <br />oN m w h m m <br />w PROFILE A <br />PROPOSED BUTTRESS DESIGN <br />8440 <br />6430 <br />w 6420 <br />2_ <br />Z <br />4 <br />> 6410 <br />PIT RON GRAVEL <br />2:25 <br />1� <br />6420 <br />z <br />4 <br />6,00 w <br />-F sae3 <br />a$ <br />Q- <br />om <br />o <br />o <br />8120 <br />z <br />z <br />8410 <br />6390 <br />i <br />NOTES <br />1 ASSUMED WATER TABLE LOCATIONS BASED ON FIELD OBSEnvATIONS <br />AND SOIL BORINGS. <br />2. BUTTRESS TO BE CONSTRUCTED FROM LOCAL PIT GRAVEL <br />3 KEYWAY EXCAVATION AND DRAIN INSTALLATION WILL BE OBSERVED <br />BY HARDING LAWSON ASSOCIATES FIELD REPRESENTATIVE. <br />4 CLAY REMOVED FROM SLOPE SHALL BE USED AS A CLAY CAP ON <br />THE SURFACE OF SOIL BUTTRESS SOIL SHALL BE "TRACK' COMPACTED. <br />5. KEYWAY SHALL BE EXCAVATED F FEET MINIMUM INTO FIRM MAY OR <br />DEEPER AS DIRECTED BY HLA REPRESENTATIVE. <br />6. TEMPORARY STORAGE OF CLAY REMOVED FROM KEYWAY SHALI <br />BE PLACED ON ELECTRICAL SUBSTATION ACCESS ROAD <br />I DRAIN LINE LOCATION SHALL BE ESTABLISHED IN THE KEYWAY <br />AND BASE OF THE EXISTING BIN WALL. <br />6 <br />0 —0 <br />0 10 <br />NO VERTICAL EXAGGERATION <br />B' <br />a <br />61511 <br />c <br />Q2 <br />¢> <br />< a <br />E %ISTING BIN WALL .°j W <br />HAUL <br />ROAD <br />— — <br />6440 <br />6400 <br />�<oa 3 <br />i <br />e43n <br />8120 <br />z <br />z <br />8410 <br />6390 <br />i <br />NOTES <br />1 ASSUMED WATER TABLE LOCATIONS BASED ON FIELD OBSEnvATIONS <br />AND SOIL BORINGS. <br />2. BUTTRESS TO BE CONSTRUCTED FROM LOCAL PIT GRAVEL <br />3 KEYWAY EXCAVATION AND DRAIN INSTALLATION WILL BE OBSERVED <br />BY HARDING LAWSON ASSOCIATES FIELD REPRESENTATIVE. <br />4 CLAY REMOVED FROM SLOPE SHALL BE USED AS A CLAY CAP ON <br />THE SURFACE OF SOIL BUTTRESS SOIL SHALL BE "TRACK' COMPACTED. <br />5. KEYWAY SHALL BE EXCAVATED F FEET MINIMUM INTO FIRM MAY OR <br />DEEPER AS DIRECTED BY HLA REPRESENTATIVE. <br />6. TEMPORARY STORAGE OF CLAY REMOVED FROM KEYWAY SHALI <br />BE PLACED ON ELECTRICAL SUBSTATION ACCESS ROAD <br />I DRAIN LINE LOCATION SHALL BE ESTABLISHED IN THE KEYWAY <br />AND BASE OF THE EXISTING BIN WALL. <br />6 <br />0 —0 <br />0 10 <br />NO VERTICAL EXAGGERATION <br />Classl,OPermit <br />6400 <br />�<oa 3 <br />i <br />SecUoNEXhibit_._._._._._._._._._._. _._._._._._._._._._-- ._._._._._ <br />8 <br />a <br />0 <br />a <br />CIAY/COLLUVIUM <br />OCl <br />DRAIN <br />6390 <br />fiS�1 <br />i <br />KEYW9X \ <br />\`N' <br />F5. =149 <br />BEDROCK <br />SOILBORINGSM <br />PROFILE B <br />/ ATER TABLE <br />/ (SEE NOTE p <br />_ <br />T <br />\ <br />PROPOSED BUTTRESS DESIGN <br />OApdaon (Coal omy) O Bond O Enforcement O Inspection <br />g/ <br />gn.�syYwn++�m�nlnyM WPprvG WYJI�45pLI�LFS. <br />8120 <br />z <br />z <br />8410 <br />6390 <br />i <br />NOTES <br />1 ASSUMED WATER TABLE LOCATIONS BASED ON FIELD OBSEnvATIONS <br />AND SOIL BORINGS. <br />2. BUTTRESS TO BE CONSTRUCTED FROM LOCAL PIT GRAVEL <br />3 KEYWAY EXCAVATION AND DRAIN INSTALLATION WILL BE OBSERVED <br />BY HARDING LAWSON ASSOCIATES FIELD REPRESENTATIVE. <br />4 CLAY REMOVED FROM SLOPE SHALL BE USED AS A CLAY CAP ON <br />THE SURFACE OF SOIL BUTTRESS SOIL SHALL BE "TRACK' COMPACTED. <br />5. KEYWAY SHALL BE EXCAVATED F FEET MINIMUM INTO FIRM MAY OR <br />DEEPER AS DIRECTED BY HLA REPRESENTATIVE. <br />6. TEMPORARY STORAGE OF CLAY REMOVED FROM KEYWAY SHALI <br />BE PLACED ON ELECTRICAL SUBSTATION ACCESS ROAD <br />I DRAIN LINE LOCATION SHALL BE ESTABLISHED IN THE KEYWAY <br />AND BASE OF THE EXISTING BIN WALL. <br />6 <br />0 —0 <br />0 10 <br />NO VERTICAL EXAGGERATION <br />00169" <br />R <br />Classl,OPermit <br />�<oa 3 <br />R g ,�, B R <br />SecUoNEXhibit_._._._._._._._._._._. _._._._._._._._._._-- ._._._._._ <br />8 <br />a <br />0 <br />a <br />& R <br />0 <br />< Q i Class: O Revision <br />Ow <br />< < < < <br />y 0 Type /Se ----------------------- ---- <br />w Class: port O Hydro OGeneral � <br />M` "6s .,,.b,n,n.n,m,o <br />w <br />PROFILE B <br />PROPOSED BUTTRESS DESIGN <br />OApdaon (Coal omy) O Bond O Enforcement O Inspection <br />gn.�syYwn++�m�nlnyM WPprvG WYJI�45pLI�LFS. <br />P <br />DRAWT'1' <br />PROJECTING. <br />TAG 32640,4 <br />Harding Lawson Associates <br />MOUNTAIN COAL COMPANY <br />ENGINEER: <br />SCALE <br />La <br />Engineering and <br />CHECKED: <br />AS SHOWN <br />e _ - _ = Environmental Services <br />SOIL BUTTRESS BUTTRESS DESIGN <br />APPROVED: <br />- - - -- _ tx E15''0 um rerryle <br />Smm 1sTo <br />WEST ELK MINE SECTIONS A -A', B -B' <br />F <br />o. DATE REVISIONS <br />BY CHK DATE: <br />DATE: <br />Sell Lake CM. UWh BITI1 <br />(8011363A455 <br />SOMERSET, CO <br />00169" <br />R <br />