My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP10906
DRMS
>
Back File Migration
>
Report
>
REP10906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:40:17 PM
Creation date
11/27/2007 12:32:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
7/12/1999
Doc Name
BATTLE MOUNTAIN RESOURCES INC DMG PN M-88-112 MONTHLY SAMPLING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 ~~ ' III IIIIIIIII IIII III <br />' RECEIVED 999 <br />JUL 12 1999 <br />Division of Minerals & Geology <br />July 08, 1999 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-112 <br />Monthly Sampling <br />Dear Mr. Dillie <br />All required sampling was completed during the month of June. Enclosed are analytical reports <br />from Sangre De Cristo Lab (SDC) and Acculabs for the recent monthly sampling period as specified <br />in the April 1992 Abatement Plan. The cross-reference table between sample identification <br />numbers, sample types and sample locations is also attached. Analysis that have not been <br />received will be forwarded to you as I receive them. <br />All surface water stations were inspected and RS-4 and RS-6 were found to be dry. <br />Vacuum on the lysimeters was verified and no water was present to sample. <br />When we checked the piezomelers on the main embankment of the tailings impoundment on <br />06/30/99, the piezomelers were dry or contained well below 12 inches of water. <br />The two west pit piezomelers were measured for depth to water on 06/30/99, with the following <br />result: BF-I was 10.90 ft and BF-2 was 14.50 fi. The other piezomelers in the West Mine area were also <br />checked with the following result: PW-I was 16.40 ft, PW-2 was 14.40 ft, PW-3 was 22.40 ft and PW-4 <br />was 25.0 ft. <br />The underdrain was measured at approximately 26 gpm <br />The collection pond's leak detection system was sampled and pumped dry. The leak was <br />measured at approximately 42 GPAD. <br />By the end of June the evaporation system was nearing completion. On July 02, 1999 two of the <br />evaporators were placed in operation. <br />As anticipated in the TR-26 report we added containment and two additional pumps in the seep <br />area. The newly contained water is also pumped to the infiltration trench. <br />
The URL can be used to link to this page
Your browser does not support the video tag.