Laserfiche WebLink
<br /> <br /> <br />STATE OF ~II II~~I~~I~~~~~ ~I~ <br />sss <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY ' '- <br />~ <br />I lrp,lrlmonl of N.vural KCSnurt uv ° <br />141 I tihrrmdn SL, Koum 21 5 +q <br /> <br />1 k~nvar, <~uloi.ldu f40!Ili I <br />~~~ <br /> <br />I'Lnnr ({II q 740L~ 15L' II <br />I -\t: 141111 !4 I! ~f{ I IIO <br /> DEPARTMENT OF <br /> NATURAL <br />DATE: February 20, 1997 RESOURCE <br /> Rnv Rome, <br />~.,,..~.,~„~, <br />T 0 : <br />Susan Burgmaier ~ h„ <br /> <br />~ ~~~ <br />~~ ,,,,,,,,,,,,,, <br />,,,,,, <br />F.e,,,~,„•~,,,e,~n, <br /> <br />FROM: Jim Pendleton <br />'~-- iLL:'`G nwn,udH lung <br />I),nnnl>,"•,,,,, <br />RE: "Review of xis ~ g Compaction Data and Testing <br />Frequency for the Existing Refuse Pile, Southfield Mine - <br />Florence, Colorado" by TerraMatrix, Inc. <br />(Permit No: C-81-014) <br />In accordance with your request I have completed a review of the above <br />referenced report prepared for the Southfield Mine by TerraMatrix, Inc., a <br />geotechnical consultant. The Division recently directed the mine to address the <br />possibly substandard compaction results submitted for the coal refuse pile at <br />the Southfield Mine. In preparing my review I have also revisited a similar <br />reanalysis of the Southfield Mine coal refuse pile prepared in 1992 by ACZ, Inc., <br />a former geotechnical consultant to the operator. <br />The Situation at the Southfield Mine Coal Refuse Pile <br />The permit, as amended in 1992, specifies that coal refuse will be placed and <br />compacted in two foot lifts. A thin lift of fine coal refuse was to be placed and <br />then covered with coarse refuse to a combined thickness of two feet. The <br />combined material was then to be compacted to 90% relative density. <br />TerraMatrix reports; "However, based on TerraMatrix's observations actual <br />placement practices have been slightly different. Fines are generally being <br />placed in one-foot lifts followed by a two to four foot lift of coarse refuse. The <br />fine lifts were not compacted. However, the coarse lifts were compacted by a <br />dozer with a pull behind sheeps-foot compactor. Additional compaction was <br />provided from truck traffic." <br />