Laserfiche WebLink
~ III IIIIIIIIIIIII III ~ <br />BATTLE MOUNTAIN RESOURCES. INC. <br />October 20, 1993 <br />Mr. Larry Oehler <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, <br />DMG Permit No. M-88-112 <br />Tailings Area Construction <br />Week of October 18, 1993 <br />Dear Mr. Oehler: <br /> <br />gy~ilLE <br />(~7LD COMPANY <br />Inc. (BMRI) - San Luis <br />Activities <br />The following is an updated summary of construction <br />activities, specifically the updated liner installation <br />schedule, for the week of October 18, 1993: <br />-Complete the final shaping and liner base material <br />placement for the East dike area. <br />-Continue stockpiling and placement of liner cover material <br />on the north side of the facility. <br />-Serrot Corporation is scheduled to be on-site October 22. <br />Weather conditions pending, the liner contractor will resume <br />liner installation activities on October 22. Approximately <br />20 acres of liner remain to be installed to complete the <br />synthetic liner installation. The liner installation is <br />expected to be completed by November 1. <br />If you have any questions, please call. <br />Sincerely, <br />~~4 ~ ~~- <br />Alana L. Scott <br />Environmental Engineer <br />cc: Anne Baldrige <br />Ken Kluksdahl <br />Mike Young <br />A SUOSIDIARY OF OATTLF AfOUATAIA' GOLD COMPANY <br />P.O. BOX 310 SAN LUIS, COLORADO R1152-0310 (719) 672-336? FAX (719) 67?-3363 <br />