My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP08007
DRMS
>
Back File Migration
>
Report
>
REP08007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:38:01 PM
Creation date
11/26/2007 11:47:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989052
IBM Index Class Name
Report
Doc Date
10/25/1996
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 1102 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ <br />• <br />• iii iiiiiiiiiiiii iii <br />Notice of Intent to Cont;nue Mining Operations RECEIVED <br />110(2) Annual Report <br />Permittee Name: Denver Brick Company ~~~ 2 5 X996 <br />Permit No: M-89-052 <br />Operation Name: Dakota Clay Pit* <br />Anniversary Date: 10/25/96 OlwelnnFrmmara~rx6eology <br />Total: $225.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: County where mine is located: <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br />Does this mine operate MORE or LESS than 180 days per year? MORE <br />Do you extract MORE or LESS than 70,000 tons of mineral or <br />overburden a year? MORE <br />3 <br />4.. _ <br />5. <br />6 <br />7 <br />~~ ~e~So~1 <br />Does this mine have a phased reclamation plan? YES <br />Total _acres .affected .dur_i ng_ the_report_year_• * -__ <br />Total acres reclaimed for the report year:* <br />Total acres in various stages of reclamation:* <br />a. Backfilled: d. Topsoil replaced: <br />b. Graded: Average topsoil thickness <br />c. Seeded: replaced: <br />List species seeded & seeding <br />rate for report year on back <br />The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />8. Estimated total acres to be affected in the next' report y/ear:* _ <br />9. COMMENT15 ,~o ne~wQG~eer~~ ~ ~/~`~~d r~'~~h ~^h <br />COrr~inhGS 1iB1-~ ~~r`Jt~ ~rh ~ri9viDUS lc~ ~/S~<.~ C ~ <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />~ a`~ ~~9~ <br />Signature: /,1~yn,G Date: <br />Please type or print current contact name, mailing address, and phone number below: <br />Contact Name: N/a~y,-~e ~ifJCr~~e Phone: (303) (,a'~69-fj <br />Company: ~~rY/e.- ~j--i~ ~ Co . <br />Address: D'D l3a~ /6 0 0 <br />b <br />LESS <br />LE S <br />NO <br />Federal Tax ID No. or Social Security No.: ~~^ ~~~/ ~~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.