Laserfiche WebLink
iii iiiiiiiiniu iii <br />999 <br />RECEIVED <br />February 27, 1998 rliyi5ion of MingrdlS & G2010gy <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-1 12 <br />Quarterly, Monlhly and Bi-weekly Sampling <br />Dear Mr. Dillie: <br />Enclosed are analytical reports from Sangre De Cristo Labs (SDC) and Accu-Labs for the recent <br />quarterly, monthly and bi-weekly sampling periods as specified in the April 1992 Abatement Pian. <br />Results of humidity cell tests from CORE lab are also enclosed. The cross-reference table between <br />sample identification numbers, sample types, and sample locations is also attached. <br />All required sampling was completed. Analyses that have been received are enclosed and those <br />that have not been received will be forwarded to you as soon as they are sent to me. <br />Si~ely, <br />00 ~ri~~z~.ur~P,~- <br />Ron Zumwalt <br />Enclosures <br />cc: Bill Lyle <br />DanRoberfson <br />File <br />