Laserfiche WebLink
ar..~r=;v~r~ <br />IIIIIIIIIIIIIIIIIII ~"~~ "~h~~~ <br />999 ~-a~--9~ <br />OCT 11 ~~ ~~ <br />LOWER REFUSE PILE INSPECTION <br />~SI'~IGAT~IAI~Q'<H7CRITICAL CONSTRUCTION PERIODS <br />THIRD QUARTER 1994 <br />Critical construction periods of the French drain and soil buttress installation (Technical <br />Revision No. 66, Slide Repair and SW Lower Refuse Pile Re-Configuration 9/93) were <br />inspected. <br />During the 3rd Quarter 1994, the following construction was completed on the Lower <br />Refuse Pile according to the approved Technical Revision: <br />1. Removal of all organic material and topsoil, <br />2. Placement of under drainage systems, <br />3. Installation of surface drainage systems. <br />The construction was completed according to the approved plans and specifications, and <br />inspected by qualified persons under the direction of a Certified Professional Engineer. <br />`~l<-~ G S~w.~ <br />Phil G. Schmidt <br />... ~ ~T.1~~\e <br />•~ <br />., <br />.~ ~ . ~ <br />~' ~, <br />r ) <br />F~ i <br />.... ~ <br />i. i <br />,' ~ ~6S ,~ <br />., <br />,. <br />sl~(s~ <br />Date <br />