My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06458
DRMS
>
Back File Migration
>
Report
>
REP06458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:57 PM
Creation date
11/26/2007 11:21:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993087
IBM Index Class Name
Report
Doc Date
4/21/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATION 110 C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; <br />999 <br />Notice of Intent to Continue Mining Operati44gCEIVF r <br />110c Construction Materials Annual Report <br />Permittee Name: Baca County ~L] n ~ ~nn7 <br />Permit No. M-93-087 11~~ [ OO/ <br />Operation Name: Weeden Pit No 30* <br />Anniversary Date: February 24, 1997 ~IYIS~ ~ <br />Total: $225./00 (Due on your Anniversa~lyd~p~•.-,,,, <br />1. a. Permitted acreage: Q.0 b. County where mine is located: Q~ <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br />Does this mine operate MORE or LESS than 180 days per year? MORE ESS <br />3. Does this mine have a phased reclamation plan? ES NO <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:* Q <br />6. Total number of acres i.n topsoil replacement stage; (~ <br />a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br />a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: <br />a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* <br />10. Estimated total acres to be affected in the next report year:* o~ <br />11. COMMENTS: <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** NOTB: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must,,b11e st~latepd/~above. <br />Signature J Date : `"T' I `1 ~ 1 1 <br />Please type r print(~current contact~'lname, mailing address, and ph/~one number /below: <br />Contact Name: I\F~ ~ `\er ~ l O'MN~~SS~O~r Phone: 1(-1 ~~~' fo-~3~ <br />C FAX NO: ( ~' ) ~~ ~~~ <br />Company: C <br />Address: <br />~,~ ~,~\ 0~3 ' f f <br />Federal Tax ZD No. or Social Security No.: V 1~ bOw /~ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.