My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP06404
DRMS
>
Back File Migration
>
Report
>
REP06404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:55 PM
Creation date
11/26/2007 11:20:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
4/20/1998
Doc Name
WEST PIT FILL CONSTRUCTION REPORT
From
COLOWYO COAL CO
To
JIM KIGER
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i/~ Kennecott <br />~ . Energy ~__ <br />Cofoavyo CoalConrpany L.~. '~` <br />FOR: Jim Kiger <br />West Pit Fill Inspection Certification <br />~iiiiiiuiiiniiiiii <br />Memorandum <br />Apri120, 1998 <br />On March 31, 1998, I inspected the area in which the West Pit Excess Spoil <br />Fill is being constructed. The purpose of this inspection was to observe the <br />surface rock drain that borders the 3:1 Excess Fill Slope, inspect the areas <br />dumped to final grade on the 7200, 7250 and 7275 dump areas; inspect the re- <br />vegetation on the fill surface and to inspect the fill for areas of water <br />seepage or surface drainage, inspect the final grade slopes below the 7300 <br />elevation of the Excess Fill Slope, and to satisfy the requirements of CMDG.. <br />Rule 4.09.1 (lla1. <br />During the inspection it was observed that the condition of the fill was <br />good, no seeps or springs were noted. The collection ditches at the 6950, <br />7050 and 7150 elevations all were in relatively good shape. The collection <br />ditch on the 7250 elevation has been completed on the East half of the fill, <br />however, the west half of the fill at that elevation has not yet been <br />completed. At the toe of the fill 3-9 gallons per minute was running from <br />underneath the fill, 4-5 gallons per minute from under the toe of hillside <br />drain, 4-5 gallons per minute of water was running from the west hillside <br />drain and 2-3 gallons per minute runoff was observed in the surface drain. <br />I am a mining engineer, registered in the State of Colorado, and <br />experienced in the construction of rock and earthen projects for the purposes <br />of mining activities. <br />To the best of my knowledge, based on my professional expertise the West <br />Pit Excess Spoil Fill has thus far been constructed in conformance with the <br />prudent state-of-the-art methodology for earth and rock fill construction, as <br />specified in pages Ia-2 through Ia-4, Exhibit 19Ib, and other applicable <br />requirements of the approved permit documents, a portion of CMDG. Permit C-81- <br />019. <br />Registered P.E <br />
The URL can be used to link to this page
Your browser does not support the video tag.