Laserfiche WebLink
- • • III IIIIIIIIIIIIIIII <br />COLORADO MESTMORELAND INC. sss <br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />ITEM YES NO COMMENTS <br />1. Quantity of waste material added to <br />waste disposal area this quarter. <br />To-1za/ 3553y, S Y~3 <br />(See attached calculations,) <br />2. Waste material desposited and tom- x <br />patted in 24" lifts? <br />3. Drainage alterations constructed? /~ <br /> ~~' <br />4. Present height of waste material, <br /> X <br />5. New bench constructed? <br />6. Refuse material outslope paced at )( <br />1V:2H? <br /> TOE ~39-S HGT .6f,.6y <br />7. Top of completed fill at 5%? COT<E7~0. <br /> x <br />ti. Bench drainage adequate? <br /> Ovf SLOPES <br />9. Areas covered with 4' nontoxic non- ~( <br />combustible material? <br /> X <br />10. Berms constructed on outslopes? <br /> X <br />11. Evidence of structural defects? <br /> ao To`sar~ se<`~~~-a <br />12. Topsoil adequately salvaged and stored? T/'fjS QUA~f'TEiP <br /> '~ <br />13. Trash being removed? <br /> ~ <br />14. Additional comments? <br />Inspector: iiGGh11 ~¢~~ Date of Inspection: ~0 /Fj ~`~ <br />I hereby certify that the construction of the waste disposal area was done under my <br />direct Supervision and is constructed as per the current Colorado Mined Land Reclamation <br />Permit requirements/~/ - / <br />gnature <br />