Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />999 <br />August 14, 1998 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RECEIVED <br />AUG 1 7 1998 <br />DIV. OF MINERALS <br />& GEOLOGY <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />August 09 - Aug~MU\st 15, 1998 <br />Dear Mr. Dillie: ~/ V <br />Attached is a sum~mUga-rly~of the on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the week <br />of August 09 - August 15, 1998 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.080 ppm CN-wad and 1.064 <br />ppm CN-total. The collection pond averaged 0.018 ppm CN-wad and 0.031 <br />ppm CN-total. <br />Sincerely, <br />Ron umwalt <br />cc: Bill Lyle <br />Dan Robertson <br />