Laserfiche WebLink
iii iiiiiiiiiiiii iii <br />~` <br />BATTLE MOUNTAIN RESOURCES, INC. <br />May 7, 2001 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 21 ~ <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />D;viG Fermit No. M-88-I 12 <br />Monthly Pond Compliance Report -April, 2001 <br />Dear Mr. Dillie: <br />RE~~i~jEl3 <br />Mar ~ o z~nt <br />Oivisi0n of Minerals and Geolugy <br />Attached is the April 2001, monthly summary of cyanide analysis performed on samples from the <br />tailings pond and the collection pond as required. TR-O10 specifies a simple monthly average for <br />regulating pond compliance. The April averages are as follows: <br />Tailings Pond 0.01 ppm CN-wad, 0.22 ppm CN-total. Collection Pond 0.35 ppm CN-wad, 0.75 ppm <br />CN-total. <br />SiG"E! ' y,f <br />Dav}d E. Long Q <br />Environmental Coordinator II <br />Enclosures <br />cc: Bill Lyle <br />File <br />A SURSIDIAR}' OF BATTLE b10UNTAlN GOLD COM1IPAA'}~ <br />P.O. Box 310 San Lm.,. Colorado SI 153-0310 (719) 672-41?? Fdx (719) 673-3363 <br />