My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05199
DRMS
>
Back File Migration
>
Report
>
REP05199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:11 PM
Creation date
11/26/2007 11:00:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977324
IBM Index Class Name
Report
Doc Date
2/19/1993
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 110 2 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />:_ <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />» ~ III IIIIIIIIIIIII III <br />Notice of Intent to Continue Mining Operations ~ E~ 1 9 199 <br />110(2) Annual Report <br />Uivw. _,. <br />Summi t Brick & Ti 1 e MINERALS u ,;",~. „1'./ <br />M-77-324 <br />Stocks Clay Mine* (~ n <br />02/17/93 `~a~~" (~ <br />$175.00 (Due on your Anniversary Date) ~;a ~ 3/ <br />1. Has this mine been granted TEMPORARY CESSATION STATUS? YES NO <br /> Does this mine operate MORE or LESS than 180 days per year? MO <br />RE <br />L SS <br />2a. Financial Warranty: $ ~SG2~ 2b. Permitted acreage: p <br />d <br />7~ y ~/ <br />3. Does this mine have a phased reclamation plan? ~ NO <br />4. Total acres affected during the report year:* ~. ~ ~ ± <br />5. Total acres reclaimed for the report year:* /..~~ ~ <br />6. Total acres in various stages of reclamation:* <br /> a. Backfilled: /{, SA ~" d. Topsoil replaced : ~ O ~ ~ <br /> b. Graded: ~{,S/~ ~ Average topsoil thickne s <br /> replaced: <br /> c. Seeded: ~_ <br /> List species seeded & seeding <br /> rate for report year on back <br />7. The type and approximate quantity of fertilizers, organic mat erial or soil <br /> conditioners used for the report year:* it/on~E <br />8. Estimated total acres to be affected in the next report year: * ~~ ~ <br />9. COMMENTS: SF~' ~3AGK <br /> <br />* Please show the location of the acreage for items 4 - 6 on your map*'. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOTE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, this must be stated above. <br />Signature: ~ l~ A~~ Date: 0~ ' /S~ ~ J <br />Please type or in/t current contact name, mailing addr.,ess, <br />Contact Name: J056~/f L vVE~T•E hone: <br />Company: Sv/~7/97/T ~R/cK ~T/~E <br />Address: /',~, gaX S33 <br />;Ovt", _ ~ /oaf `c~33 <br />and phone number belo~ <br />(?r9 > s~~-~a7S <br />Federal Tax ID No. or Social Security No.: ~7 -_ O ,3,3I~~0 <br />~''~ <br />~,' <br />
The URL can be used to link to this page
Your browser does not support the video tag.