My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP05095
DRMS
>
Back File Migration
>
Report
>
REP05095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:36:07 PM
Creation date
11/26/2007 10:59:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989052
IBM Index Class Name
Report
Doc Date
10/23/1992
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 1102 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III ~ <br />Notice of Intent ta~ontfnue Mining Operations <br />110(2) Annual Report ., Y: <br />Permittee Name: <br />Permit No: <br />Operation Name: <br />Anniversary Date <br />Total: <br />Denver brick Company <br />M-89-052 <br />Dakota Clay Pit` <br />10/25/92 <br />R,~ ,~ <br />-G~~i ~~ <br />~~,~ <br />~~r2~ 199 <br />MIN D/VIS~U~~ Ur <br />ERALS& ~E~, ~jC;~ <br />$175.00 (Due on your Anniversary Date) <br />1. Has your mine been granted TEMPORARY CESSATION STATUS? <br />Does your mine operate MORE or LESS than 180 days per year? <br />2a. Financial Warranty: $ SOOD 2b. Permitted acreage <br />3. Do you have a phased reclamation plan? <br />4. Total acres affected during the report year:* <br />5. Total acres reclaimed for the report year:` <br />YES <br />MORE LESS" <br />y, 9 9 <br />YES NO <br /> <br />6. Total acres in various stages of reclamation:' <br />a. 8ackfilled: ~ \ d. Topsoil replaced: `~ <br />b. Graded: / } ~ oa,~ Average topsoil thickness <br />c. Seeded: / replaced: /l/~} <br />List species seede~eding <br />rate for report year on back <br />7 <br />8 <br />9. <br />` Please show the location of the acreage for items 4 - 6 on your map" . <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. <br />** NOIE: If there have not been any changes since the last annual report and you <br />previously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, then a new map is unnecessary. However, you must state this fact above. <br />Signature: p~~~~-.,ems/c% ~~:.~!~ Date: ~~~~C7-~Z <br />Please type or print current contact name, mailin address, and phone number below: <br />Contact Name: VV QYn e ~,(/CncP_ ~ Phone: (3~.3) 6 c~~ ~9~:z <br />Company: ~e~ ~~r Iy,.sc ,~ ~o • - <br />Address: ~O l30~ /6/00 <br />~~ /G OG K , ~v ~0/05~ o ~>S / Y~6 <br />Federal Tax ID No. or Scc'a~ Security No.: _ _ __ _ ~ _ lo~ <br />The type and approximate quantity of fertilizers, organic materria/l or soil <br />conditioners used for the report year:' Sd~# //-s S 'I v.-T:/,'ac- <br />Estimated total acres to be affected in the next report year:' ~ .2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.