Laserfiche WebLink
'-~ivisinn M Minera~s a u~~„ar <br />July 29, 1999 <br />RECEIVED <br />AUG 0 21999 <br />III IIIIIIIIIIIIIIII <br />Ciwsion cl Minerdh & ~~ <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />weekly Pond Compliance Report <br />July 25, 199///9///~~~~~~- July 31, 1999 <br />Dear Mr. Dillie: <br />Attached is a summary of the cyanide analysis performed on samples from <br />the tailings pond and.the collection pond during the week of July 25, <br />1999 - July 31, 1999 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.033 ppm CN-wad and 0.183 <br />ppm CN-total. The collection pond averaged 0.074 ppm CN-wad and 0.129 <br />ppm CN-total. <br />Sincerely, <br />~~ . <br />Ron Zum alt <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />