Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />RECEIVEp <br />JUL 0 7 1997 <br />July 03, 1997 <br />Division of Mmerais a u®oiogy <br />Mr. Jim Di11ie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: Battle Mountain Resources, Inc. - San Luis Project <br />DMG Permit No. M-88-112, TR-010 <br />Weekly Pond Compliance Report <br />June 29 - July~05, 1997 <br />Dear Mr. Dillies <br />Attached is a summary of the on-site cyanide analysis performed on <br />samples from the tailings pond and the collection pond during the. week <br />of June 29 - July O5, 1997 as required by the approved TR-010. <br />During the week, the tailings pond averaged 0.06 ppm CN-wad and 0.08 ppm <br />CN-total. The collection pond averaged 0.06 ppm CN-wad and 0.08 ppm CN- <br />total. <br />Sin erely, <br />~~~7 <br />Ron Zumwalt <br />cc: Bill Lyle <br />Dan Robertson <br />