Laserfiche WebLink
III IIIIIIIIIIIIIII! <br />999 <br />BATTLE MOUNTAIN RESOURCES, INC. <br />June 29, 2000 <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver. Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-1 12 <br />Monthly Pond Compliance Report -June, 2000 <br />Dear Mr. Dillie: <br />Attached is the June 2000, monthly summary of cyanide analysis performed on samples <br />from the tailings pond and the collection pond as required. TR-O10 specifies a simple <br />monthly average for regulating pond compliance. The June averages are as follows: <br />Tailings Pond 0.07 ppm CN-wad, 0.42 ppm CN-total. Collection Pond 0.23 ppm CN-wad, <br />0.44 ppm CN-total. <br />Sincerely, <br />~~iL%~~L <br />Ron Zumwalt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />A SUBSIDIARY' OF BATTLE MOUNTAIN GOLD COMPANY <br />P.O. Box 310 • San Lws. Colorado 81152-D310 f 719) 672-412? Fax (719 673-3363 <br />