Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascne. 6'erubve Direuo~ <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHEL70N Director <br />Rlchartl D. Lamm <br />Governor <br />January 6, 1983 <br />Mr. Ron S. Hamagami <br />Morrison-Knudson Company, Inc. <br />Two Morrison-Knudson Plaza <br />P.O. Box 7808 <br />Boise, Idaho 83729 <br />RE: Request for Modification of Inspection Schedule for Permanent Waste <br />Dump at the H-G Mine (Permit No. C-003-80) <br />Dear Mr. Hamagami: <br />The Division has reviewed your request to reduce the frequency of <br />inspection of the permanent waste pile at the H-G (Hayden-Gulch) mine. <br />The Division feels that it would be prudent to monitor the fill quarterly <br />in March and June of 1983, in order to observe the fill through one <br />additional spring wet season. Following completion of the June 1983 <br />inspection and certification, assuming no stability problems have been <br />discerned, the permanent waste pile may be inspected and certified on an <br />annual basis. Annual inspections and certifications should be undertaken <br />in September of each year to allow evaluation following the spring wet <br />and vegetative growing season. <br />If you have any questions please feel free to contact me. <br />Sincerely, <br />,~P~s~_ <br />Michael S. Savage <br />Reclamation Specialist <br />MSS/eap <br />cc: Jim Pendleton <br />X23 C°n~ernull yuildinq 131? Chrrnign Sl+nqt ~1~^v~r r:Olrna~in Hn9(r'+ ~n~ rZ;~,rl Writ, "i4i.~ <br />