Laserfiche WebLink
0 AGGREGATES, INC. GENERAL OFFlCES AND PLANT <br /> ASSOCIATED �+GG <br /> ASSO _ 11521 BRLGHTON ROAD a HENDERSON,COLORADO 80640 <br /> QUARRY <br /> 3 <br /> (303)289-3316 <br /> L-'�1 PIT LOCATION <br /> 33501 STATE HWY.6 IDAHO SPRINGS.COLO.80452 <br /> (303)571-5164 <br /> June 18, 1991 <br /> Mrs. Barbara Chiappone <br /> Colorado Mined Land Reclamation Board <br /> 1313 Sherman Street Suite 215 JUN 2 01991 <br /> Denver, Colorado 80203-22/3 Mined <br /> !7ecla nano <br /> Dear Mrs. Chiappone: rpafion Divisior; <br /> Re Associated Aggregates, Inc, <br /> Walstrum Mine, M.L. R. Permit <br /> No. 83-33 , Annual Report <br /> FUDDERAD, TAM I DO M-0915072 <br /> Our files indicate that the anniversary date for this <br /> permit is June 23. Operation continued as approved in the July, <br /> 1985 Amendment . This pit HAS NOT been granted a Temporary <br /> Cessation and it HAS operated more than 180 days this year. This <br /> is a quarry operation, as a result we remove large amounts of <br /> material without disturbing large areas of land. Please refer to <br /> the Annual Report map for the locations of areas discussed in this <br /> report. <br /> We will deal specifically with each of the Annual Report <br /> questions as outlined in Section 2 .4 .1 of the Rules and Regula- <br /> tions. <br /> 2 .4 .1 <br /> (1) No new land was disturbed this year mining continued in the <br /> area previously stripped in Phase 1. Total disturbance to <br /> date in Phase 1 is 10 .77 acres ±. We currently have 1 .93 <br /> acres ± stripped (brown) . The floor area increased by 0 .71 <br /> acres ± as the face of the mine moved into the stripped area. <br /> The current face area is approximately 1 .43 acres (yellow) . <br /> The scale and scale house were moved into Phase 1 at the <br /> entrance to the quarry in 1990 . Backfilling continued in <br /> Phase Z as approved (green) . Total disturbance in all stages <br /> remains at 18 .50 acres ±. <br /> (2) The scale house and scale was removed from Phase X in 1990 <br /> and initial grading was completed (pink) . Once the material <br /> stockpiled in Phase A was removed the only work needed was \\ <br /> to shape the slope facing the road. Most of the material was <br /> on the flat parking area. Minor amounts of backfill were <br /> placed in the valley on the eastern side of Phase 1 as <br /> approved (blue) . <br />