My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE138099
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE138099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:38:42 PM
Creation date
11/26/2007 7:00:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Permit File
Doc Date
7/16/1996
Doc Name
UNDERGROUND INJECTION CONTROL CLASS V INJECTION WELL RULE AUTHORIZATION INJECTION SITE SUNNYSIDE
From
SUNNYSIDE GOLD CORP
To
EPA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• • <br />l SUNNYSIZIE GOLa COAFOAATION <br />AM ECF3C 8AY CCMPAMY <br />P.O. Box 177 . Silverton, CO 81433 <br />Phone (303) 387-5533 . Telecopy (303) 387-5310 <br />July 15, 1996 <br />Attention. Ron Zdyb <br />Mail Code: 8D2-W-GW <br />U.S. Environmental Protection Agency <br />Underground Injection Control (UIC) <br />999 18th Street, Suite 500 <br />Denver, CO 80202-2466 <br />RE: Underground Injection Control (UlC) <br />Class V Injection Well <br />Rule Authorization <br />Injection Site: Sunnyside Mine near Silverton, CO <br />San Juan County <br />EPA File # CO5000-03745 <br />Dear Mr. Zdyb, <br />Received <br />..,,... <br />"JUI. ~ ~ I_ <br />iii iiiiiiiuiiii iii <br />DENVER <br />OFFICE <br /> <br />yj-Durs~n/g'os F :'d CI"R~ <br />IB~WII~ M NYI~'•~ fs J~LIB~ <br />Pursuant to Item 1. in the Rule Authorization Letter requirements for injection of alkaline <br />water into the Sunnyside Mine, Sunnyside Gold Corporation (SGC) submits this notuce of intent <br />to start injection on July 17, 1996. Valve closure on the American Tunnel bulkhead is scheduled <br />for July 29, 1996. This delay is scheduled to allow SGC to determine if the system is operating as <br />planned before final valve closure. <br />If you have any questions, please contact me. <br />cc: Bob Shukle, CDPHE-WQCD <br />Wally Erickson, DMG <br />Send by telecopy with confirmation original <br />Sincere) <br />~~ ~~~_ <br />Larry~erino <br />Reclamation Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.