Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />899 <br />Doc Date:12/11/2001 <br />• 3.0 PROJECT PLAN <br />The Trapper Mine project consists of diverse and interrelated activities designed to efficiently mine coal <br />and promote rectamation activities. <br />Section 3.0 discusses the major components of the Trapper Mine project. Emphasis is placed on the <br />function of each component and its interrelationship with other activities. Also presented is a general <br />description of the activity and how it complies with applicable e~dsting regulations. <br />Trapper Mine is a surface mining operetion and does not control or generate any underground work- <br />ings. Therefore subsidence will not be an issue with Trapper's operations. However, located west of <br />Trappers permit perimeter are underground workings maintained by Empire Energy Corporation. <br />During permit lama 1993-1997 and 1998-2002 Empire operations will likely continue to subside alas <br />already mined end rectaimed by Trapper Mine. Effects of their operations have been addressed within <br />the curtest Empire Energy mining permit. <br />Section 3.1.8 of this application discusses surface mining near underground workings. Trapper Mine's <br />• mining operations in the Call and Browning Pit areas (Map M10 series) were within 500 horizontal feet <br />of the abandoned underground workings. Section 3.1.8 provides evidence that no impact will occur on <br />these underground workings due to Trappers surface mining activities. <br /> <br />= _..._ gl1AY_ 1_x.1998 _... <br />.. ... <br /> <br />