Laserfiche WebLink
iii iuiiiiiiiu iii <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />t 373 Sherman St.. Room 275 <br />Denver, CO 80203 <br />303 866-3567 <br />FA x: 303 832-8706 <br />STATE OF COLORADO <br />pF CpCp~ <br />Roy Romer. <br />Governor <br />December 4 , 1990 Fretl R. Banta. <br />Division Director <br />Mr. Marshall Butler <br />Fremont County <br />615 Macon Avenue, Room B-5 <br />Canon City, Colorado 81212 <br />Re: M-90-138, Stirrup Pit, Permit Issuance <br />Dear Mr. Butler: <br />On December 3, 1990, the Mined Land Reclamation Division found Fremont County <br />to have satisfied the applicable requirements of C.R.S. 34-32-101 et seq, for <br />obtaining a mining and reclamation permit. Therefore, a permit is-'being <br />issued. Two signed originals of the permit have been executed. We have kept <br />one copy for our files and are enclosing one copy for your use, Please read <br />the terms of the permit. It is your responsibility to comply with all of the <br />terms of the permit. As a reminder, here are a few things we feel are <br />important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1.8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1.10 to Conversions. <br />3. On your permit anniversary date each year, December 5, you mist submit an <br />annual report to us. Please consult Rule 3.4 for 170 Permits, Rule 2.4 for <br />112 Permits, and Statute Section 34-32-116 (1)(a) for 111 Permits, for the <br />specific annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />Sincerely, <br />•, <br />.• :~ <br />~1~nF~' ~ ~ fC~ <br />FRED'R. ANTA <br />`Director - <br />FRB/GRS/DLM/eke/0313G <br />Enclosure <br />