Laserfiche WebLink
Page 1 of 1 <br />File name: west elk cost summary 1 page.xls <br />Date: 6262006 <br />Colorado Division of Minerels and Geology <br />Reclamatlon Cost Summary <br />Parmlt No. C-60-007 prepared by: TK <br />Mina name: West Ell( Permit orjob acdon: NOI X-2006-21207 <br />Task no. Task tlescription <br />23d Regrede drill pad and access road <br />23e Replace topsoil from stockpile to ddll pad and access road <br />24r Seed tlnll pad and access road <br />25b Seal 3 geotechnical holes and 1 exploretion hole <br />Indirect Costs <br />Contractor's overhead & profit <br />county: Gunnison <br /> Fleet Task <br />Form Usetl <br /> Size Hours <br />tlozer 1 7.26 $ <br />dozer 1 4.38 $ <br />reveg 1 2.52 $ <br />borehole.xls 1 8.25 $ <br />n:.e..~ r...~ <br />1,070 <br />646 <br />2,224 <br />2,740 <br />SUBTOTAL 22.41 $ 6,680 <br />LiabiliTy insurance: 2.02°k % of direct costs total = $ <br />Performance bond: 1.05% %of direct costs total = $ <br />Job supedntendent: 11.205 hrs. at $ 32.25 per hour total = $ <br />Profit: 10.00% % of direct costs total = $ <br />DMG project management <br />Engineering work antl/or bid preparation: 4.25°/ % of direct costs <br />ReGamafion management and/or administration: 3.25% % of direct vests <br />Contingency 0 % of direct costs <br />Total indirect reclamation costs <br />Total pertonnance bontl amount (direct costs plus indirect costs) <br />135 <br />70 <br />361 <br />668 <br />$ 284 <br />$ 217 <br />$ - <br />$ 1,735 <br />$ 8,415 <br />