My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126031
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:19 PM
Creation date
11/25/2007 2:47:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003001
IBM Index Class Name
Permit File
Doc Date
8/14/2003
Doc Name
2nd Adequacy Review Reponse
From
Hall-Irwin Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGNSTRIJ CTIGN ~ AGGREGATES ~ LEASING ~ GOLF <br />August 8, 2003 <br />Mr. Thomas A. Schreiner <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RECEIVED <br />AUG 14 2003 <br />Division or Minerals and Geology <br />RE: Hall•Irwin Corporation, File No. M-2003.001 ~ /asr: $,,~~~ <br />Nissen Farm Resource Regular 112 Permit Application <br />2nd Adequacy Review Response <br />Dear Mr. Schreiner: <br />The following are responses to your second Adequacy Review dated August 7, 2003. Please note <br />the item numbers correspond to items listed in your letter. <br />6.4.3 EXHIBIT C -Pre-Mining and Mining Plan Mauls) of Affected Lands <br />2. As we have mentioned, the maps depict the exact locations of the "known easement <br />boundaries for such structures:' The maps already reflect the minimum setbacks from the <br />easement boundary, rather than the pipelines. <br />3. Hall-Irwin is committed to complying with Division requirements (as well as other federal, state <br />and local rules and regulations). If configurations change, Hall-Irwin will apply for either a <br />Technical Revision or an Amendment, as required by the Division. <br />6.4.4 EXHIBIT D - Minin4 Plan <br />4. Hall-Irwin will submit a copy of the Spill Prevention, Control and Countermeasures (SPCC) <br />Plan as a Technical Revision, prior to disturbance at the site. <br />6. The temporary stockpile locations are already shown on the Mining Plan Map. The stockpiles <br />in the processing area will contain material that can be sold. The stockpiles within the oil and <br />gas setbacks will be used for reclamation. We estimate that during phase three, there will be <br />about 535,000 cubic yards of overburden and 16,000 cubic yards of topsoil that will be <br />available for final reclamation. It is unclear to us however, how this corresponds with Section <br />6.4.4(d), which states, "The mining plan shall supply the following information, correlated with <br />the affected lands, map(s) and timetables:...the size of area(s) to be worked at any one time:' <br />HALL 1 RWIN <br />C O R P O R A T I O N <br />3G2E 4TM AVE. GREELEY~ COLORA00 50631 • P.O. Box 519 GREELEY. CoLORA OO 50632 <br />990-352-6059 ~ 3C3-654-1 654 METRO ~ 990-352-6204 Fox <br />
The URL can be used to link to this page
Your browser does not support the video tag.