Laserfiche WebLink
<br />• <br />• iii iiiiuiiiiiu iii <br />999 <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Date : 27-Sep-2000 Permit or job no.: M-2000.118 Site : Pino Pit <br />User : JCS Abbreviation : none State :Colorado <br />Filename : M118-000 County : Huer/ano <br />Agency or organization name : DMG <br />Permit or job action :ESTIMATE RECLAMATION COST <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK DIRECT <br />HOURS COST <br />002 -SPREAD EXCESS OVEBURDEN dozer 1 351.0 $42,264 <br />001 -BACKSLOPE/BACKFILL HIGHWALLS dozer 1 624.0 $75,052 <br />003 -SPREAD TOPSOIL dozer 1 86.0 $10,392 <br />004 -SCARIFY COMPACTED AREAS ripper 1 22.0 $2, 798 <br />005 -REVEL revege 1 24.0 $24,043 <br />006 -MOB/DEMOB mobilize 1 8.0 $1,196 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suerorALS: 1,115. $155,745 <br />• inclutles inflation factor etllustment of : NA % TOTAL DIRECT COST' = f155,745 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT ~ Llabllty Ir1SUranCe : 1.55 % O1 direct total = $2,414 <br />Performance bond : 1.05 % o/direct total = $1,635 <br />Job superintendent : NA' NA NA total = NA <br />Profit : 10.00 % of direct total = $15,574 <br />not /equireo (or eqp. operator serves Bs Super.) TOTAL O 8 P = $19, 624 <br /> CONTRACT AMOUNT (tlirect+08 P)= $17$,369 <br />PROJECT MANAGEMENT- <br />Engineering work and/or contracVbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % 01 cntr. NA total = $8,768 <br />CONTINGENCY - NA' NA total = NA <br />oonlinge/lcies accounted for of Iesk level TOTAL INDIRECT COST = $28,392 <br />TOTAL BOND AMOUNT (direct + Indirect) = 5184,137 <br />