Laserfiche WebLink
• Appendix A <br />Letter regarding availability of Dll's <br />Facilities Removal <br />Table A-1, Facilities Removal Calculations <br />PR-5 Culvert Removal Worksheet <br />Industrial Waste Pond Clean-up and Removal Back-up <br />Waste Drum Disposal Back-up <br />Table A-3, Impoundment Regrade Volume Calculations <br />Miscellaneous Costs <br />Mob/Demob Costs <br />Reclamation Activity -Schedule <br />Job Supervision and Overhead <br />Pond Cleaning <br />Site Maintenance <br />Monitoring Well Info from PR4 -escalated 5% for PRS <br />TALPAC Topsoil Routes <br />• Regrade Cross-Sections <br />Ash Disposal Area Regrade Cross-Sections <br />D Pit Regrade Cross Sections (same as PR-4) <br />F Pit Dipline Regrade Cross-Sections <br />F Pit Strikeline Regrade Cross Sections <br />G Pit Strikeline Regrade Cross Sections <br />Z Pit Strikeline Regrade Cross Sections <br />• <br />~~5 ~/3o f v3 <br />