Laserfiche WebLink
0 <br />IN 1 -2950 <br />71871 <br />BOT M OF P <br />ELEV. 7179 <br />TDIP O EMBANK ENT <br />EL V. 7 83.7 <br />/ �) H OC DA E� I6? 7 -91 <br />r <br />A <br />7185 -I <br />7184 <br />7183 <br />SPILLWAY <br />CAE V. 5 <br />TOP OF EMBANKMENT <br />ELEV. 7183.7 <br />SPILLWAY <br />ELEV. 7183.5 <br />SECTION A -A' <br />HORIZ: 1 " =10 <br />VERT: 1" =1' <br />A0 <br />w <br />O <br />O <br />7185 <br />7184 <br />7183 <br />2 9 O <br />ELEV. <br />STAGE <br />AREA <br />STOCKTANK T -12 <br />CAP. TOT. CAP. DESCRIPTION <br />(FT. —msl) <br />(FT.) <br />(ACRES) <br />(AC. —FT.) (AC. —FT.) <br />7179.0 <br />0.00 <br />0.000 <br />0.00 0.00 BOTTOM OF POND <br />7180.0 <br />1.00 <br />0.001 <br />0.00 0.00 <br />7182.0 <br />3.00 <br />0.010 <br />0.01 0.01 <br />i <br />7183.5 4.50 0.021 0.02 0.03 SPILLWAY <br />7183.7 4.70 0.024 0.00 0.04 TOP OF EMBANKMENT <br />••�.P °: ARNEER'S CERTIFICATION <br />-Now Colorado P.E. 19959 <br />04 •66IRKE <br />�rer MAR 3 0199? <br />Pea oal Company Date: <br />RECEIL tzL) <br />APR 3 1992 <br />Mined Land <br />Reclamation Diwl ^(ten <br />PeMft Numbef C /1590 00 <br />Class. jBPermd 1' Q <br />Section/Exhibit: Yo-- 12 jA6 13 �' /,,by I s— <br />! Class: O Revision _. _. ._._._._._. ._.___._._._._., <br />' Type/Seq: ! <br />Class: O Report D Hydro OGenerrel _._-_- __- ___._- _____.___.___- _.___._ <br />Doc Type: <br />OApplicetlon (Coal only) D Bond O Enforcement O Inspection -- <br />EXHIBIT 13 -9.T12 <br />TEMRARY STOCKTANK T -12 <br />AS -BUILT <br />SENECA II MINE <br />EABODY COAL CO. 1300 S. YALE FLAGSTAFF. AZ 86001 <br />DA <br />� 006580 <br />